Vacant Land Due Diligence Worksheet for U.S. Buyers

Use this worksheet to compare vacant U.S. parcels for the same planned use. Start with one copy per parcel. Record the source and date for each answer, keep written quotes together, and mark open questions before you compare prices. The fields below are scratch space on this page. They have no submit button or save function. Print a blank copy or copy your notes to your own file before leaving the page.

Identify the parcel and planned use

Record what you can verify

Give each item a status in your notes: verified in writing, estimate, open, or not applicable. For each open item, record the next person to contact and when their answer is needed.

Zoning and intended use

Ask the planning office about the specific use and parcel. Record the zoning district, the written answer, and any approval the office says you still need.

Title, road access, and boundaries

Have the relevant recorded documents and title exceptions reviewed. Ask which survey or access documents show the route and who maintains it.

Flooding, drainage, and soils

Look up the parcel in the FEMA Flood Map Service Center and USDA Web Soil Survey. Note the mapped conditions and ask the local office or a qualified professional what needs site verification.

Water, sewer or septic, and power

Ask providers for the connection point, who pays for extension work, what the quote covers, and when the quote expires. For septic, ask the local permitting authority what it requires for this parcel.

Driveway and site preparation

Ask for written estimates that identify the assumed driveway length, clearing limit, grading, and drainage. Record which costs depend on a survey or field visit.

Contract and review deadlines

Record the applicable dates from the signed agreement and ask your adviser what notice is required and how it must be delivered.

Compare costs on the same basis

Add the asking price, estimated closing and investigation costs, and site work needed for the same planned use. Separate written quotes from allowances. List each missing item by name and check which vendor is responsible for it, especially for trenching or restoration that can appear in more than one estimate.

Illustrative costs for two parcels in U.S. dollars
CostParcel AParcel B
Asking price$57,000$67,000
Closing and investigation allowance$4,000$4,000
Driveway and utilities allowances$18,000$6,000
Subtotal before unresolved costs$79,000$77,000
Still openSeptic design and installationWritten sewer connection confirmation

In this hypothetical example, Parcel A’s asking price is $10,000 lower, but its working subtotal is $2,000 higher. Both parcels still have an open wastewater question. The subtotals provide a basis for asking for comparable written quotes. They exclude house construction, carrying costs, and any costs still marked open.

Summarize your next decision

Bring the worksheet and supporting documents to the people helping you review the parcel. For the full buying sequence, read how to buy land in the U.S. Use the raw land due diligence checklist for a more detailed review and the house-building cost guide to put site work and construction into separate budgets.