Use this worksheet to compare vacant U.S. parcels for the same planned use. Start with one copy per parcel. Record the source and date for each answer, keep written quotes together, and mark open questions before you compare prices. The fields below are scratch space on this page. They have no submit button or save function. Print a blank copy or copy your notes to your own file before leaving the page.
Identify the parcel and planned use
Record what you can verify
Give each item a status in your notes: verified in writing, estimate, open, or not applicable. For each open item, record the next person to contact and when their answer is needed.
Zoning and intended use
Ask the planning office about the specific use and parcel. Record the zoning district, the written answer, and any approval the office says you still need.
Title, road access, and boundaries
Have the relevant recorded documents and title exceptions reviewed. Ask which survey or access documents show the route and who maintains it.
Flooding, drainage, and soils
Look up the parcel in the FEMA Flood Map Service Center and USDA Web Soil Survey. Note the mapped conditions and ask the local office or a qualified professional what needs site verification.
Water, sewer or septic, and power
Ask providers for the connection point, who pays for extension work, what the quote covers, and when the quote expires. For septic, ask the local permitting authority what it requires for this parcel.
Driveway and site preparation
Ask for written estimates that identify the assumed driveway length, clearing limit, grading, and drainage. Record which costs depend on a survey or field visit.
Contract and review deadlines
Record the applicable dates from the signed agreement and ask your adviser what notice is required and how it must be delivered.
Compare costs on the same basis
Add the asking price, estimated closing and investigation costs, and site work needed for the same planned use. Separate written quotes from allowances. List each missing item by name and check which vendor is responsible for it, especially for trenching or restoration that can appear in more than one estimate.
| Cost | Parcel A | Parcel B |
|---|---|---|
| Asking price | $57,000 | $67,000 |
| Closing and investigation allowance | $4,000 | $4,000 |
| Driveway and utilities allowances | $18,000 | $6,000 |
| Subtotal before unresolved costs | $79,000 | $77,000 |
| Still open | Septic design and installation | Written sewer connection confirmation |
In this hypothetical example, Parcel A’s asking price is $10,000 lower, but its working subtotal is $2,000 higher. Both parcels still have an open wastewater question. The subtotals provide a basis for asking for comparable written quotes. They exclude house construction, carrying costs, and any costs still marked open.
Summarize your next decision
Bring the worksheet and supporting documents to the people helping you review the parcel. For the full buying sequence, read how to buy land in the U.S. Use the raw land due diligence checklist for a more detailed review and the house-building cost guide to put site work and construction into separate budgets.
Official starting points
- FEMA Flood Map Service Center for mapped flood hazards.
- USDA guide to Web Soil Survey for initial soil screening.
- EPA septic system questions for how to identify the local permitting authority.